The Install Insights Revit add-in: from model to site and back

    The model is where the BIM coordinator works; the drawings are where installers work. The Install Insights Revit add-in connects the two in both directions, so site progress ends up back in the model.

    Why progress belongs back in the model

    On most jobs the Revit model is finished at design and then left alone. Progress is tracked somewhere else: on marked-up PDFs, in spreadsheets, in a weekly report. The BIM coordinator who owns the model can't see what has been installed, and the model shown at coordination meetings says nothing about the building as it stands.

    The Install Insights add-in for Revit, Install Insights Companion for Revit, closes that loop. It sends the model and drawings out to Install Insights, where installers record what they have installed, then brings that progress back into Revit on each element. The model becomes a picture of the job as it is today.

    From Revit to site, step by step

    1. Open the model and the add-in. The add-in runs inside Revit 2024, 2025 and 2026. Sign in to Install Insights from it; the sign-in happens in your browser, so your password is never typed into Revit.
    2. Link the organisation and the project. Choose the Install Insights organisation and project the model belongs to. This is done once per model.
    3. Export the model and the drawings. From the add-in's export tab, choose the sheets to send. They arrive in Install Insights as drawings, along with the model the 3D viewer and the quantities are built from.
    4. Track progress on site. Installers mark installed work on those drawings or the 3D viewer, on a tablet or phone: complete, or on hold when something is in the way.

    From site back into Revit

    Back in Revit, import the updated progress from the add-in. Each element tracked in Install Insights gets its installation status written to a parameter, II Status, on the element itself: completed, in progress, on hold or not started.

    Revit can only give one value to a whole element, while on site a long cable tray or duct run is often only partly installed. Install Insights records the installed length exactly, and in Revit a partly installed element shows as in progress, so a run is never shown as finished before it is.

    Each import brings the model up to the latest record from site, so run it as often as the team needs: before a coordination meeting, before a client report, or at the end of every week. Between imports, the dashboards in Install Insights stay live.

    Colour the model by status

    Once the parameter is in the model, Revit's own tools do the rest. Set up view filters on II Status with a colour per status, and any 3D view or plan shows what is installed, what is in progress and what is on hold. Typical uses:

    • A coordination view showing which zones are complete before the ceiling closes.
    • A view template the whole team shares, so every update looks the same.
    • A Revit schedule filtered by status, exported for a progress report.
    • Screenshots of the colour-coded model for the client's monthly report.

    Because the parameter is ordinary Revit data, it travels with the model into whatever you already do with it.

    Revit progress tracking without leaving the model

    Tracking progress in Revit by hand usually means a phase or a custom parameter that someone updates from marked-up drawings, element by element, once a week. It is slow, it falls behind, and the person doing it is rarely the person who saw the work go in.

    With the add-in, the people who install the work record it as they go, on the drawings they already use, and the BIM coordinator brings it into the model in one import. Nobody retypes progress, and the model, the drawings and the dashboards all read from the same record, so they can't disagree.

    That makes the model useful in places it usually isn't:

    • Coordination meetings: show the colour-coded model and agree what can close up, area by area.
    • Look-ahead planning: see which runs are on hold before planning next week's work around them.
    • Handover: a model that records installation status per element is a better starting point for as-built records than a set of marked-up PDFs.
    • Client reporting: a status view of the model says more in one image than a table of percentages.

    What the BIM coordinator sets up once

    The BIM coordinator links the model to the project and chooses which sheets to export. After that, re-export when the design changes and import progress whenever you want the model brought up to date, for example before each coordination meeting.

    Installers never open Revit and need no BIM skills or licences. They work on the drawings and the 3D viewer in a web browser. The office gets live dashboards, quantities and percent complete by system, and progress maps to the programme imported from Primavera P6 or Microsoft Project (see what an XER file is).

    Where to go next

    For tracking the model itself on site, read MEP installation progress tracking in Revit. Cable and equipment are tracked from their schedules and linked to the model by tag, as in cable and equipment schedule tracking. Everything else is on the features page.

    Frequently asked questions

    Short answers to the questions people ask most about this topic.

    Revit 2024, 2025 and 2026.

    The installation status is written to the II Status parameter on each tracked element: completed, in progress, on hold or not started. Use it in view filters, schedules and tags like any other parameter.

    Install Insights tracks the installed length of a run exactly. Revit can show only one status per element, so a partly installed element is shown as in progress until the whole of it is complete.

    Yes. II Status is an ordinary parameter once it is in the model, so it can be a column in a Revit schedule, a filter rule in a view or the value shown by a tag. A schedule filtered to on hold, for example, lists every element that is blocked on site.

    Whenever you want the model to be current. Progress is recorded in Install Insights as installers work, so many teams import before each coordination meeting or each weekly report. The dashboards in Install Insights are live in the meantime.

    No. Installers mark their work on the drawings or the 3D viewer in a web browser, on a tablet or phone. Only the person who exports the model and imports progress uses Revit.

    Start a free trial of Install Insights for one project, or contact us and we'll walk through the round trip on a sample model.

    Bring site progress into your model

    Book a demo to see the Revit round trip on a sample model, or start a free trial of Install Insights.