Track every cable from the schedule you already have

    Your cable and equipment schedules already list what has to go in. Install Insights tracks progress against them, row by row.

    Start from the schedule you already have

    Import a cable or equipment schedule from a CSV, XLS or XLSX file, or pick it up from SharePoint or Google Drive. There is nothing to retype.

    A column mapper tells Install Insights how to read it: which column is the row id, and what the rows are grouped under, for example the source panel.

    Tick each row through your stages

    You define the stages each row goes through. For a cable that might be pulled, terminated, tested and energised. Progress is a grid: one row per item, one column per stage, and a tick when a stage is done.

    Items that can't go ahead yet can be put on hold. When the schedule changes, import it again. The re-import creates a new revision, and the progress already recorded carries over.

    Open the schedule from the model

    A schedule links to equipment in the model by its tag, so a whole panel's cable schedule can link to its switchboard. In the 3D viewer, right-click the board and choose Track equipment progress to work through its rows.

    Progress that reaches the programme

    Schedule progress rolls up to the programme on the Schedule page. The office can see how far cabling and equipment have got without asking for a separate report.

    Track your next cable schedule

    Book a demo to see a schedule tracked from import to programme, or start a free trial of Install Insights.